---
title: Creating a recurring series
category: Editor
summary: Create dates that repeat daily, weekly or monthly, add exceptions such as public holidays and learn what happens when you change or delete a series.
---

# Creating a recurring series

Courses often take place at regular intervals, e.g. every Tuesday from 18:00 to 19:30 for ten weeks. Instead of adding each date by hand, you create a **series**. You define the rule once, and all dates are created automatically.

You'll find series in the **Dates** section of the editor.

## Before you start

- **Plan:** Series require the **Pro** or **Enterprise** plan. In the Basic plan, **Add series** is disabled and marked with a **PRO** badge.
- Check the **Time zone** in the **Location** section. The times of the series are planned in the time zone of the event.
- A series can create at most **104 dates** and always needs an end.

## Step 1: Open the series window

1. Open the event in the editor and click **Dates** in the navigation.
2. Click **Add series**. The **Series** window opens.

## Step 2: Choose the rhythm

1. Under **Repeat**, choose **Daily**, **Weekly** or **Monthly**.
2. Under **Every**, enter the interval, e.g. `1` for every week or `2` for every other week. The unit (days, weeks or months) is shown next to the label.
3. Complete the rhythm depending on your choice:
   - **Daily**: nothing else to set.
   - **Weekly**: select one or more weekdays (**Mon** to **Sun**), e.g. **Tue** and **Thu**.
   - **Monthly**: under **Monthly on**, choose
     - **Specific day** and enter the **Day of the month**, e.g. `15` for the 15th of every month, or
     - **Specific weekday**, then choose **First**, **Second**, **Third**, **Fourth** or **Last** and select exactly one weekday, e.g. "Last Fri".

> **Day 29, 30 or 31:** In months that don't have this day, the date is moved to the last day of the month, e.g. from the 31st to 30 April. No date is skipped.

## Step 3: Set the start, times and end

1. **Start of the series**: the day the series begins. A new series is preset to one week from today.
2. **From** and **To**: the start and end time of each date, in the time zone of the event (shown in the label). If **To** is earlier than **From**, each date ends on the following day, e.g. 22:00 to 02:00.
3. Under **End**, choose how the series ends:
   - **Ends after**: enter the **Number of dates** (1 to 104).
   - **Ends on**: choose the **End date**. It can't be before the start of the series.

The times stay the same throughout the series, also when daylight saving time begins or ends. A course at 18:00 always starts at 18:00 local time.

## Step 4: Add exceptions (optional)

Under **Exceptions (e.g. public holidays)**, add the days on which no date should take place:

1. Click the date field and choose a day.
2. The day is added as a chip. Repeat for further exceptions.
3. To remove an exception, click the **×** on the chip.

With **Ends after**, exceptions don't reduce the number of dates. The series is extended by one rhythm instead. Eight dates stay eight dates.

## Step 5: Check the preview

Click **Preview** to see all dates the series will create, e.g. "8 dates". Exceptions are shown crossed out with the note "cancelled". The preview doesn't save anything.

If the series would create more than 104 dates, you'll see the warning "More than 104 dates – please adjust the end." Shorten the series before saving.

## Step 6: Save

1. If the event is already published, decide whether to **Notify participants about changes**. This option is selected by default.
2. Click **Save**.

The series appears above the list of dates with a short summary of its rule. The dates it created appear in the list with the label **Series**.

## Changing a series

1. Click the pencil icon in the row of the series.
2. Change the rule, e.g. the time or the end.
3. Check the **Preview** and click **Save**.

What happens to the existing dates:

- **Past dates** stay unchanged.
- **Upcoming dates** are deleted and created again according to the new rule.
- **Upcoming dates that you've changed individually** (label **Manually adjusted**) or **for which attendance has already been recorded** are kept.

Dates that are created again have no title, note or translations. If you've added titles to individual dates, check them after changing the series.

## Deleting a series

1. Click the bin icon in the row of the series.
2. Confirm the message.

Only the rule is deleted. **All dates it created are kept** and become single dates. If you don't need them any more, delete or cancel them individually.

## Changing a single date of a series

You can edit, cancel or delete individual dates of a series in the list of dates, e.g. to move one date to another day. An edited date is marked as **Manually adjusted** and isn't touched when you change the series later.

## Good to know

- **Several series:** An event can have several series, e.g. one on Tuesdays and one on Thursdays with different times. You can also combine series with single dates.
- **Maximum of 104 dates per series.** For longer courses, create a second series that starts after the first one ends.
- **After a downgrade:** The series and its dates are kept, but you can no longer edit the series. From the second date onwards, participants can no longer book the dates.

## Troubleshooting

- **"Add series" is disabled?** Series require the Pro or Enterprise plan.
- **"A series may have at most 104 dates and needs an end." when saving?** Reduce the **Number of dates** or choose an earlier **End date**.
- **"The end must be after the start." when saving?** **From** and **To** must not be the same time. With **Ends on**, the end date must not be before the start of the series.
- **"The input is incomplete or invalid." when saving?** For **Weekly** and **Specific weekday**, select at least one weekday.
- **Fewer dates than expected?** Check the exceptions and the **Start of the series**. Weekdays before the start date aren't included in the first week.
- **The titles of some dates are gone after a change?** Upcoming dates are created again when you change a series. Add the titles again or edit important dates individually before changing the series.
